电气自动化专业自我评价
无论是身处学校还是步入社会,我们会经常用到自我评价,自我评价会促使我们进行自我验证,从而为自我发展提供动力。如何写一份恰当的自我评价呢?下面是小编为大家收集的电气自动化专业自我评价,欢迎阅读与收藏。
电气自动化专业自我评价1
Time flies, blink of an eye to the company has been a year, feeling a lot, a lot of harvest. Into the City Electrical Equipment Co., Ltd., for me is a good opportunity for development, is also a good exercise and enhance their ability to various aspects of the opportunity. In this first special thanks to the leadership and colleagues to give me the strong support, care and help so that I can quickly adapt to the company's management system, and strive to do their jobs. Into the company, I seriously understand the company's development profile, learning the company's rules and regulations, familiar with the company's processes. At the same time, it is truly feel positive, inspiring corporate culture, so I benefited from. Now I work over the past year summarized as follows:
First, solid work
I entered the workshop from the sheet metal began to do chest box shell, can be said that the sheet metal shop is my first impression of the company. Have to say, in the sheet metal workshop a month, the master who gave me a good image, so I benefited.
Last September, I went into the assembly workshop internship, I deeply feel my colleagues work diligently, and strive to perfect the spirit. In the assembly workshop, I focus on access to relevant information, manuals, drawings and instructions to understand the operation of electrical equipment and principles, learning equipment layout, wiring, do row, the second line. Into the assembly plant began, I know that their burden is very heavy, I always remember this sentence to give others a bowl of water, they will have a bucket of water. Because I know that in order to become a qualified technician is not an easy task, as a technician not only to be able to deal with the requirements of customers, more importantly, to be able to solve the problems on the scene, on-site equipment operation Situation to be aware of.
In May this year, following the installation team to Panzhihua, I seize the time familiar with the drawings, construction plans, drawings, the construction site management, acceptance and other requirements. In the face of difficulties and problems, take the initiative to consult the leadership, and design units and construction units to communicate and coordinate relations, in order to smooth the work of the project. The actual work, due to some local civil engineering changes and drawings, resulting in the wall without leaving holes, bridge and pipe unreasonable, need to open or re-layout to take the line, increase the workload, and after the leadership communication has been resolved. Therefore, in future work, I will pay attention to relevant knowledge, so that their own from the civil, decoration, budget and other aspects of strengthening, good external coordination, and actively design units, construction units and government departments to communicate, to develop a good overall planning, Where the interests of the main companies.
Second, efforts to learn and progress
In the work, serious study, and constantly improve themselves, and the use of other time, learn more advanced knowledge. From the simplest manufacturing standards start to do a complete set of equipment, where both their own studious, but also inseparable from the workshop colleagues Q & A FAQ. From the old engineer who I not only learned a lot, but also gave me a lot of sentiment. For the first time I do equipment, colleagues not only help me carefully but also patiently explained to me, very grateful to colleagues for their help, but also in our culture so that the company better work with sufficient confidence.
Third, shortcomings and shortcomings
As I participated in the work soon, so in many ways the technology and experience are inadequate, the problems encountered, the problem can not be handled handy. In the future work, we must dare to solve and deal with problems encountered problems, never escape, humbly to the experienced technicians, the old workers to learn; In addition, the timely organization of lessons learned, the existence of doubt, do not understand the aspects are recorded Down, and seize the time to solve the problem, make a record, so that later encountered the same thing, can solve the problem faster. Conscientiously learn all kinds of knowledge, so that their future work, to better complete the leadership of the work and tasks assigned to make themselves more mature faster.
Fourth, self-evaluation
Although I participated in the production of labor and technology study time is only one year, but in the ideological and technical have been greatly improved and progress. Not only enrich the knowledge, but also to improve their management and business level, the most important thing is for their own work in the future, to better completion of the task to lay a good foundation.
Summing up the work of the past year, both achievements and deficiencies. In the future work, only continue to seriously sum up, found inadequate, and strive to correct, in order to get faster progress in order to better serve the company, realize the value of life.
电气自动化专业自我评价2
An excellent electrical engineer with 15 years of electrical work seek the position of electrical engineer, in order to give full play to 10 years of state-owned enterprises and five years of foreign engineers work accumulated by the rich professional knowledge and skills, including the design and review of electrical drawings, various industrial field automation control system installation and commissioning, Of the commercial negotiations and on-site installation commissioning and guidance, all kinds of imported equipment maintenance and maintenance.
I hope to be able to use my knowledge and accumulated work experience to better serve your company while maximizing the interests of the enterprise. During the project construction period or after the factory is put into operation, I hope to be an electrical engineer.
电气自动化专业自我评价3
四年紧张而充实的大学生活,丰富了我,也磨砺了我。回忆四年的历程,就要离开学习和生活过的地方,而迎面而来的将是社会的锻炼,于是更加的怀念这个紧张而有序的大学生活,它给我留下了很多美好回忆,我孜孜不倦,勇于挑战自我,充实自己。
在学习上:我广泛涉猎了《物理》,《机械制图》,《计算机应用基础》,《C语言》,《电工基础》,《模拟电子技术基础》,《数字电子技术基础》,《工厂电气设备控制》,《电力及电机拖动》等方面的电气工程及自动化知识,先后参加学院组织的《工程概预算》,《电子商务概论》,《电气故障查找》,《设备改造技术》,《市场经济》等各类选修课,并把理论知识应用于实际操作中取得了国家技能鉴定的特种作业操作证,高级电工证。
除了学习主修课之外,还利用课余时间专修计算机,使我能熟悉各种网络和办公软件。曾获过二等奖,除了在专业知识方面得到好的成绩,平时我还涉猎了很多网络编程,网络管理与维护,网页设计等知识。
有句俗话是这样说的:不谋全局者,不足以谋一时。所以我不断地寻找机会锻炼自己,领导者的能力是能观察入微的。进入学生会,我是从低做起的,当时很不甘心,可现在回想起来,却是十分感激那时的经验。在低处做起,一步一步往上爬,而成为干部,感觉就像在自己的生命中添上了精彩的一幕,成为了另一种无形的力量在鼓励我,让我在修养方面能够品德优良、正直诚恳;在性格方面为人谦虚有亲和力,能有很好处理人际交际的能力。
在工作方面能踏实,任劳任怨,责任心强,具有良好的组织交际能力,配合部长出色的完成了校团委的宣传活动和内部的各项宣传活动。我结合自身的特长,曾在校团委举办的手工制作大赛中获奖。由于工作积极努力,成绩突出,被评为校“优秀共青团员”,得到老师和同学们的一致好评。无论工作多累,多繁琐,都不再是一种疲惫,而是一种满足和快乐。
在充满科学,人文气息的大学,我满怀信心和热情地度过了我人生中有重大意义的四年。通过四年的学习和生活,我思想变得更加开放,上进和务实,对知识的追求更加渴望。诚信为本,以德立身是我的做人原则;工作生活中积极进取,严格要求自己,努力塑造完美充实的自我。
大学不但教会了我知识,让我懂得为人处事的方式,更磨练了我坚强的意志和必胜的信心。在这即将挥手告别美好的'大学生活,踏上社会旅途的时候,我将以饱满的热情,坚定的信心,高度的责任感去迎接新的挑战,跨越新的高峰。
电气自动化专业自我评价4
四年的大学生活即将结束,我是一名应届毕业生,回顾这四年,作为一名电气工程及其自动化专业的学生,应该说收获是多方面的。
四年来,在师友的严格教益及个人的努力下,我具备了扎实的专业基础知识,系统地掌握了电气控制,自动化理论等有关理论;熟悉涉外工作常用礼仪;通过英语四、六级考试,具备较好的英语听说读写译等能力;能熟练操作计算机办公软件,c++语言编程。同时,我利用课余时间广泛地涉猎了大量书籍,不但充实了自己,也培养了自己多方面的技能。更重要的是,严谨的学风和端正的学习态度塑造了我朴实,稳重,创新的性格特点。
此外,我还积极地参加各种社会活动,抓住每一个机会,锻炼自己。大学四年,我深深地感受到,与优秀学生共事,使我在竞争中获益;向实际困难挑战,让我在挫折中成长,培养了自己吃苦耐劳的精神。祖辈们教我勤奋,尽责,善良,正直;大学培养了我实事求是,开拓进取的作风。并在老师的帮助培养下加入了中国共产党,成为了一名光荣的共产党员。
在校期间我刻苦学习、严格遵守学校的规章制度、社会公德,尊敬师长,团结同学乐于助人,在德、智、体、美、劳方面得到全面发展。平时我的课余活动也十分广泛,乒乓球、篮球、羽毛球等球类运动都是我的爱好,还喜欢阅读书籍,这主要是为了培养艺术能力,有艺术才会树立好形象,才能用计算机设计出代表个人、企事业单位的好标志。
我热爱贵单位所从事的事业,并有信心与能力胜任这份工作,殷切地期望能够在您的领导下,为这一光荣的事业添砖加瓦,并且在实践中不断学习、进步。在能力和素质方面进一步完善自我,为贵公司做出更大的贡献。
电气自动化专业自我评价5
At present, he works in the domestic and international famous steel enterprise engineering technology limited company (metallurgy grade A, civilian grade A), mainly engaged in the industry and the people electrical engineering project design work and the project manager work.
Mainly for the iron and steel metallurgy, such as rolling, steel, sintering, ironmaking, chemical and civil construction projects such as electrical design work, mainly involved in the design project are:
Large-scale sintering desulfurization project, domestic sewage treatment, waste acid treatment, chemical companies for power distribution system transformation, lime cellar frequency and control system transformation, a district police station and other industrial and civil project design icipate in the project both industrial electrical automatic control system design, and high and low voltage power supply and distribution systems, substations, transmission systems, residential, office buildings and other public construction projects electrical design.
Up to now, the company has completed more than 100 projects of large and small projects with more than 10 million yuan of investment, mainly in charge of department of electrical professional, chief engineer, registered electrical engineer and project manager.
【电气自动化专业自我评价】相关文章:
电气自动化专业自我评价05-04
电气自动化专业自我评价范文12-23
电气自动化个人自我评价03-19
电气自动化个人自我评价范文03-19
电气自动化自我评价范文(精选5篇)10-08
电气专业简历自我评价12-10
电气自动化专业的自我鉴定12-25
电气工程及其自动化简历自我评价12-11
电气自动化专业学生的自我鉴定08-11